
Medical-equipment manufacturing · Dera Bassi, Punjab
850 kW for medical-equipment manufacturing
Delivered for Allengers Medical SystemsTHE PROJECT
Cleaner energy behind medical technology.
An 850 kW rooftop plant brings on-site solar generation to Allengers’ medical-equipment manufacturing facility in Dera Bassi.
FROM NEED TO OUTCOME
The need. The solution.
The difference.
Address consistent manufacturing demand.
Medical-equipment production requires substantial electricity. Allengers wanted to reduce purchased energy and environmental impact while managing manufacturing overheads.
Industrial solar for a specialist facility.
Ekam Energy delivered an 850 kW industrial rooftop system with Tata Power Solar modules, supported by system engineering, installation, monitoring and service.
Lower grid reliance in production.
Estimated annual generation of 11–12 lakh units contributes to the facility’s operational energy needs and supports lower-carbon medical-equipment manufacturing for domestic and export markets.
HOW EKAM DELIVERS
One accountable partner.
Every project stage.
Site, load and feasibility review
System design and generation planning
Procurement and quality-led installation
Testing, approvals and handover
Monitoring and long-term service
Assess the manufacturing operation itself.
For medical-equipment businesses, the solar opportunity lies in the factory’s electricity use. Plant capacity should be considered against production demand and the available rooftop.
Generation and CO₂ figures are estimates, not guaranteed results. Actual output varies with weather, site conditions and system operation. One electricity unit equals one kilowatt-hour (kWh).



