Representative rooftop solar installation, not the featured project

Scientific and laboratory-equipment manufacturing · Saha, Ambala, Haryana

100 kW for scientific-equipment manufacturing

Delivered for EISCO Labs

Representative image — not a photograph of this project.

100 kWInstalled capacity
Estimated 1.3–1.4 lakh units annuallyEstimated annual generation
Estimated 130 tonnes CO₂ avoided annuallyEstimated annual CO₂ avoided
Saha, Ambala, HaryanaProject location

THE PROJECT

Cleaner energy for scientific-equipment production.

A 100 kW rooftop installation at EISCO Labs in Saha brings renewable generation into the manufacture of scientific and laboratory equipment for export markets.

FROM NEED TO OUTCOME

The need. The solution.
The difference.

THE CHALLENGE

Address production and testing demand.

Equipment testing, climate control and production lines contribute to the manufacturer’s electricity needs. EISCO wanted to improve cost efficiency and environmental performance.

THE SOLUTION

100 kW of grid-tied rooftop solar.

Ekam Energy engineered and commissioned the system using Tata Power Solar equipment, with monitoring and ongoing support for the installation.

THE OUTCOME

Support lower-carbon export manufacturing.

The plant’s estimated 1.3–1.4 lakh units of annual generation reduces grid purchases and supports EISCO’s sustainability objectives as a supplier of laboratory and educational science products.

HOW EKAM DELIVERS

One accountable partner.
Every project stage.

ASSESS

Site, load and feasibility review

ENGINEER

System design and generation planning

DELIVER

Procurement and quality-led installation

COMMISSION

Testing, approvals and handover

SUPPORT

Monitoring and long-term service

FOR YOUR FACILITY

Make energy performance part of operations.

For an export manufacturer, on-site solar can support both operating-cost management and sustainability goals. Tracking generation keeps that contribution visible over time.

Generation and CO₂ figures are estimates, not guaranteed results. Actual output varies with weather, site conditions and system operation. One electricity unit equals one kilowatt-hour (kWh).

← ALL PROJECTSDISCUSS A SIMILAR PROJECT →
VISIT USSCO 481-482, First Floor, Sector 35 C, Chandigarh
CALL OR WHATSAPP+91 94296 90105Sales: Mon–Sat, 10:00 AM–6:00 PM
EMAILinfo@ekamenergy.com
◉WhatsApp☎Call→Get a Quote